币币麦

Mining is an energy business that speaks in coins.

JPMorgan estimates Bitcoin production cost at $86,000 as price falls below $60,000

What happens to mining operations when Bitcoin trades below its estimated production cost? In a report dated November 18, 2026, JPMorgan put the average cost of producing one bitcoin at about $86,000, up from $77,000–$78,000 in June and $85,000 in September. These are the bank’s estimates, not measured costs for every miner; the source does not break them into equipment, power and other expenses.

As reported on November 23, Bitcoin had traded near $65,000 when the report was released—a gap of roughly $21,000 per coin. After the price fell below $60,000 on November 20, that gap exceeded $26,000. Bitcoin reached a low of $58,300 that Friday.

JPMorgan described production cost as a soft floor, not a guaranteed price support. The bank said higher-cost miners might sell reserves to fund operations or shift toward AI computing. It also suggested that if less efficient machines shut down, a decline in network hashrate and a subsequent difficulty adjustment could narrow the estimated cost-price gap without a price recovery. That network-level scenario does not establish the costs or decisions of any individual miner. JPMorgan attributed price weakness to retail outflows from crypto ETFs and changing expectations for interest-rate cuts.

Further reading